BIMtropía
The model that coordinates all.
BIMtropía arises from the combination of “BIM” and “entropy”: entropy measures a system’s disorder, while BIM is the force that reverses it.
In the face of the typical chaos found in construction—scattered information, a lack of coordination among stakeholders, and data-free decision-making—BIMtropía applies BIM as an organizing principle, centralizing information into a single, coherent model that reduces the entropy of the construction process.
We implement BIM in building, infrastructure, and urban planning projects, from design through to maintenance.
Pioneers in Spain since 2015. Projects in 6 countries.
BIM and sustainable certification from the same firm.
We are the only team in Spain capable of offering BIM implementation and LEED, BREEAM, VERDE, or Passivhaus certification—all based on the same project, the same model, and a single point of contact. When energy efficiency is addressed within the BIM model from the very beginning—rather than as an add-on service at the end—the savings in cost, time, and documentation are real and measurable. The BIM model directly feeds the energy analysis. There is no duplication of work or information.
OmniaCurva
BIMtropía
ZEROvã
A single team. From the preliminary design to the certification seal.
The BIM Plan is now mandatory.
32%
26%
87%
45%
The State of BIM in Spain (2025)
Source: buildingSMART Spain, January 2025
Since April 2025
Since October 2025
Mandatory BEP
What does the Spain BIM Plan say?
Does your company meet the requirements?
BIM Plan Spain. Services.
BEP
Implementation in your company
CDE
The problem we solve.
BIM at the end of the project
Non-standard models
BIM and sustainability separately
How we work
01
02
03
04
Three phases, one model.
Bimtropía [MODEL]
Bimtropía [BUILD]
Bimtropía [MANAGE]
Integrated BIM model
→ Collision detection
→ IFC Export - OpenBIM
→ Validation against BEP
Monitoring and documentation
→ 4D Planning
→ Construction documentation
→ Final As-Built
Gestión, CDE y mantenimiento
→ BIM stakeholders workflows
→ Energy integration
→ BIM for facility management
BIM PROJECTS
Who we address.
Construction companies and contractors
Real estate developers
Public entities
Facility Management
Architectural and Engineering Services
Private clients










BIM Seminars and Workshops Conducted
Pioneers in BIM since 2015
BIMtropía held its first BIM seminars back when the methodology did not yet exist in the majority of Spanish firms.
16 seminars held at associations of architects, technical architects, and engineers over the course of 7 years.
Twelve years of BIM coordination,
at a price that doesn't hold your project back.
Top-tier expertise at the most competitive price on the market.
No intermediary markups · no large-firm overhead · direct contact with the person signing off on the project.
Custom implementation
Measurable efficiency
BIM Audit
Project coordination
A single point of contact
Do you want to implement BIM in your project or company?
Tell us about the scope and phase, and whether you have a tender with BIM requirements.
Within 48 hours, we will propose a plan tailored to your actual situation.















